Envia.it
  • Who we are
    • Profile
    • Quality Policy
  • What we do
    • Business
      • Engineering
      • Consulting
      • Surveys
    • Focus Area
      • BIM e Geotechnics
      • Sustainable design and processes
      • GIS and Database
      • FEM Modelling
      • 3D Surveys
      • Brownfield Services
      • rigeo3D
  • Works
    • Environment
      • Roncajette disused landfill
      • Highway fuel stations
      • Virtus tennis sport center
      • Italgas former depot in Venice
    • Civil Constructions
      • New residential development
      • Condo energy improvement
      • Skyscraper renovation
      • Seismic improvement of the Guardia di Finanza building
      • New parking lots at Rimini and Ferrara train stations
    • Energy
      • Naro solar farm
      • Abruzzo wind farm
      • Technologic pole at Capodichino Airport
    • Industrial Constructions
      • Bunge plant Ravenna
      • Ex-Ilva steel plant Italy
      • NewCold plant Fiorenzuola
      • Section Beam Mill Duferco
    • Infrastructures
      • Genova Gronda
      • Canali-Buracchione road junction
      • Formigine railway underpass
      • Rimini Airport
      • Milano Linate Airport
      • Ferrara-Poggio Renatico Railway Line
    • Multiutilities
      • HERA Group asset management
      • 2i Rete Gas network survey
      • Acque Veronesi sewer network survey
      • CADF new sewer collector
    • Telecommunications
      • Fiber optic network extension of Emilia Romagna
      • BUL plan preliminary design
      • Fastweb FTTH Design
      • Infratel projects in Veneto
      • TIM cabinet desaturation
      • Wind H3G Design
      • Galata telecom towers
      • H3G telecom towers
  • News
  • Contacts
Italiano
  • Who we are
    • Indietro
    • Profile
    • Quality Policy
  • What we do
    • Indietro
    • Business
      • Indietro
      • Engineering
      • Consulting
      • Surveys
    • Focus Area
      • Indietro
      • BIM e Geotechnics
      • Sustainable design and processes
      • GIS and Database
      • FEM Modelling
      • 3D Surveys
      • Brownfield Services
      • rigeo3D
  • Works
    • Indietro
    • Environment
      • Indietro
      • Roncajette disused landfill
      • Highway fuel stations
      • Virtus tennis sport center
      • Italgas former depot in Venice
    • Civil Constructions
      • Indietro
      • New residential development
      • Condo energy improvement
      • Skyscraper renovation
      • Seismic improvement of the Guardia di Finanza building
      • New parking lots at Rimini and Ferrara train stations
    • Energy
      • Indietro
      • Naro solar farm
      • Abruzzo wind farm
      • Technologic pole at Capodichino Airport
    • Industrial Constructions
      • Indietro
      • Bunge plant Ravenna
      • Ex-Ilva steel plant Italy
      • NewCold plant Fiorenzuola
      • Section Beam Mill Duferco
    • Infrastructures
      • Indietro
      • Genova Gronda
      • Canali-Buracchione road junction
      • Formigine railway underpass
      • Rimini Airport
      • Milano Linate Airport
      • Ferrara-Poggio Renatico Railway Line
    • Multiutilities
      • Indietro
      • HERA Group asset management
      • 2i Rete Gas network survey
      • Acque Veronesi sewer network survey
      • CADF new sewer collector
    • Telecommunications
      • Indietro
      • Fiber optic network extension of Emilia Romagna
      • BUL plan preliminary design
      • Fastweb FTTH Design
      • Infratel projects in Veneto
      • TIM cabinet desaturation
      • Wind H3G Design
      • Galata telecom towers
      • H3G telecom towers
  • News
  • Contacts

Subsoil Digital Twin. A new service for integrating subsurface within BIM models.

Home » News » News » Subsoil Digital Twin. A new service for integrating subsurface within BIM models.

May 20, 2024
  • Uncategorized

In April, we completed the implementation of the project to enhance new innovative services related to the digitization of underground infrastructure and integration with BIM models of above-ground works. The project was made possible thanks to contributions obtained from the European Regional Development Fund (ERDF) 2021-2027 program.

In general terms, it was possible to equip our organization with the necessary tools to offer services and manage data in the area of digitization and georeferencing of attributes of the subsurface, infrastructures present in the subsurface and above-ground facilities, with a view to creating digital bases and virtual environments to support BIM (Building Information Modeling) modeling. The investments made followed the two areas indicated in the project proposal phase: 1) modernization of hardware for both field survey instrumentation and IT equipment at Envia’s legal and operational headquarters; and 2) purchase of specialist software and training services in BIM.

  • Privacy Policy
  • News
  • Contacts
  • Linkedin
  • Facebook

Envia Srl – Via Pietro da Anzola 12/ab 40141 Bologna –  p.i. 03888281205 tel. 0510956972